CNC Drilling and Marking Line for Angles
Basic Info
Model No.: TBL2532
Product Description
The machine is the automatic special production line used for angle steel drilling & marking, mainly in the field of angle steel tower industry.
Product Composition:
This machine is mainly composed of transverse conveyor, rotating loading system, infeed conveyor, CNC infeed carriage, drilling unit, marking unit, unloading conveyor, as well as hydraulic, electrical and pneumatic systems etc.
Specification:
Model | TBL2532 | TBL3635 |
Angle size(mm) | 140х140х10~ 250х250х32 | 140х140х10~ 360х360х35 |
Marking force(kN) | 1030 | |
Max. length of blank(m) | 14 | |
Max. length of finished(m) | 14 | |
Qty. of drill on each side | 3 | |
Qty. of character group | 1 | |
Qty. of character | 15 | |
Character size (mm) | 14×10×19 | |
Band mark(mm) | 50~220(Stepless) | 50~320(Stepless) |
Qty. of CNC axes | 3 | |
Spindle rotation speed(r/min) | 180-560,Transducer stepless adjustment | |
Max. infeed speed (m/min) | 40 | |
drilling diameter (mm) | Ф17.5~Ф40 | |
Stroke of Spindle(mm) | 180 | |
Programming mode | Lofting software or instruction programming | |
Overall dimensions(m) | About 32×7.5×3 | About 32×8.9×3.2 |
Weight of machine(kg) | About 17000 | About 18800 |
Our Service
Installation:
The seller shall send one engineer to the buyer's country for installation, commissioning and training. The buyer is responsible to provide all necessary equipments for handling and lifting the machine parts before seller's engineers go to the buyer's plant. In addition, the buyer should provide workers to support in installation activities, under supervision from the seller's engineers.Commission:
The Supplier should give drawings and other details of material/preparation required for installation of machinery which the buyer has to prepare and keep ready before the machine arrives at the buyer's factory. Installation and commissioning can be finished within 10-15 days for above machine generally.Training:
Training will include training on computer programming, machine operation and troubleshooting. The training time is at most 5 days for this machine.The buyer should arrange no less than two people for accepting training. After training, the buyer should sign the "Receiving & Inspection Report" supplied by the seller to demonstrate the successful finish of commissioning and acceptance of the buyer.
Detailed Images:
The Drilling Unit:
The Marking Unit:
Infeed Conveyor
NC Feeding Carriage
Hydraulic station (Denison vane Pump)
Packing Details : Packing, this model need 1*40OT + 1*40HQ;
Delivery Details : 60-90 days after get the first payment.
1. Special logistics packaging
2. Suitable carton size
3. Fasten
4. Professional placement
5. Professional shock
6. Complete package
FAQ
Q1. Are you a Manufacturer or a trading company?
A1.We are the manufacture, integrating with design, machining and assembling for angle machine.
Q2. Do you have stock product ready to deliver?
A2. In order to satisfy with the customer for fast delivery, we have certain amount of machines in stock, you can check the machine on LIVE-DEMONSTRATION at any time.
Q3. How do you deliver the finished products?
A3. The machine is mostly delivery by sea, rail way or road for some exception. For some urgent part or shipping document we delivered by air or Express like TNT, FEDEX,DHL,UPS,EMS, Etc.
Q4. How can you guarantee the after-sales service?
A4. We have the special after-sales service department, they will provide training program for operation and trouble shouting during installation. And they will visit the customer regularly for service.
all questions will be answered within 3 hours and 90% problem will be solved within 24 hours.
Q5. What's delivery time for the angle machine.
A5. Within 20 days after payment.
Q6. How can you guarantee your finished angle machine quality?
A6. First, the machine will have 8 hours idle running;
Second, we will test the machine with the material working together.
Contact us if you need more details on Angle Drilling and Marking Machine. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Machine for Tower Transmission、CNC Drilling Machine for Angles. If these products fail to match your need, please contact us and we would like to provide relevant information. A1.We are the manufacture, integrating with design, machining and assembling for angle machine.
Q2. Do you have stock product ready to deliver?
A2. In order to satisfy with the customer for fast delivery, we have certain amount of machines in stock, you can check the machine on LIVE-DEMONSTRATION at any time.
Q3. How do you deliver the finished products?
A3. The machine is mostly delivery by sea, rail way or road for some exception. For some urgent part or shipping document we delivered by air or Express like TNT, FEDEX,DHL,UPS,EMS, Etc.
Q4. How can you guarantee the after-sales service?
A4. We have the special after-sales service department, they will provide training program for operation and trouble shouting during installation. And they will visit the customer regularly for service.
all questions will be answered within 3 hours and 90% problem will be solved within 24 hours.
Q5. What's delivery time for the angle machine.
A5. Within 20 days after payment.
Q6. How can you guarantee your finished angle machine quality?
A6. First, the machine will have 8 hours idle running;
Second, we will test the machine with the material working together.
Product Categories : Drilling Machine > Angle Drilling Marking Line